Reinforcing Steel Being Placed (Construction of pipelines, syphons and tunnels) Item Info

Title:
Reinforcing Steel Being Placed (Construction of pipelines, syphons and tunnels)
Creator:
Fuller, H.W.
Date Created:
1947-06-19
Description:
Winton-Utah Contract on West Canal under Specs. 1286. This view, looking east, shows (right to left) reinforcing steel being placed for Dry Coulee Siphon No. 1, the two invert forms, which fit inside the steel for placing concrete, and the outside shell for the concrete-placing cycle.
Subjects:
canals (Washington state) construction of pipelines, syphons and tunnels
Location:
Washington (State)
Latitude:
47.408952
Longitude:
-119.508444
Publisher:
University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/
Source:
Army Corps of Engineers Dam Construction photographs, 1933-1965, PG 94, University of Idaho Library Special Collections and Archives
Finding Aid:
https://archiveswest.orbiscascade.org/ark:80444/xv165618
Source Identifier:
94-3-15835
Type:
Image;StillImage
Format:
image/jpeg

Contact us about this record

Source
Preferred Citation:
"Reinforcing Steel Being Placed (Construction of pipelines, syphons and tunnels)", Columbia River Basin Project: Dam Construction in the Pacific Northwest, University of Idaho Library Digital Collections, https://www.lib.uidaho.edu/digital/crbp/items/crbp1041.html
Rights
Rights:
In copyright, educational use permitted. Educational use includes non-commercial reproduction of text and images in materials for teaching and research purposes. For other contexts beyond fair use, including digital reproduction, please contact the University of Idaho Library Special Collections and Archives Department at [libspec@uidaho.edu](mailto:libspec@uidaho.edu). The University of Idaho Library is not liable for any violations of the law by users.
Standardized Rights:
http://rightsstatements.org/vocab/InC-EDU/1.0/