IMAGE

Days After Construction Begins On Long Lake Dam (Construction methods and Long Lake dam) Item Info

Title:
Days After Construction Begins On Long Lake Dam (Construction methods and Long Lake dam)
Creator:
Bauman, A.W.
Date Created:
1947-05-14
Description:
Columbia Basin Project, Irrigation Division, Long Lake Dam, Spec. #1401, J.A. Terteling and Sons, contractor. Long Lake Dam 169 days after start of construction. Long Lake Dam is two miles northeast of Stratford, Washington. A.W. Bauman, photographer.
Subjects:
dam construction construction methods and Long Lake dam
Location:
Washington (State) Stevens County Long Lake
Latitude:
47.837225
Longitude:
-117.839401
Publisher:
University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/
Source:
Army Corps of Engineers Dam Construction photographs, 1933-1965, PG 94, University of Idaho Library Special Collections and Archives
Finding Aid:
https://archiveswest.orbiscascade.org/ark:80444/xv165618
Source Identifier:
94-4-451
Type:
Image;StillImage
Format:
image/jpeg

Contact us about this record

Source
Preferred Citation:
"Days After Construction Begins On Long Lake Dam (Construction methods and Long Lake dam)", Columbia River Basin Project: Dam Construction in the Pacific Northwest, University of Idaho Library Digital Collections, https://www.lib.uidaho.edu/digital/crbp/items/crbp906.html
Rights
Rights:
In copyright, educational use permitted. Educational use includes non-commercial reproduction of text and images in materials for teaching and research purposes. For other contexts beyond fair use, including digital reproduction, please contact the University of Idaho Library Special Collections and Archives Department at [libspec@uidaho.edu](mailto:libspec@uidaho.edu). The University of Idaho Library is not liable for any violations of the law by users.
Standardized Rights:
http://rightsstatements.org/vocab/InC-EDU/1.0/