IMAGE
Clearing Timber [01] (Engineer recruitment program) Item Info
- Title:
- Clearing Timber [01] (Engineer recruitment program)
- Creator:
- United States. Army. Corps of Engineers.
- Date Created:
- 1964
- Description:
- Clearing timber from the land at the U.S. Army Corps of Engineers Dworshak (Bruces Eddy) Dam site on the North Fork of the Clearwater River is well underway. Dworshak Dam will set across the river about the center of the picture and will climb to a height of 673 feet.
- Subjects:
- dams in Idaho engineer recruitment program
- Location:
- Idaho Clearwater County Ahsahka
- Latitude:
- 46.514053
- Longitude:
- -116.299676
- Publisher:
- University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/
- Source:
- Army Corps of Engineers Dam Construction photographs, 1933-1965, PG 94, University of Idaho Library Special Collections and Archives
- Finding Aid:
- https://archiveswest.orbiscascade.org/ark:80444/xv165618
- Source Identifier:
- 94-0-14
- Type:
- Image;StillImage
- Format:
- image/jpeg
Source
- Preferred Citation:
- "Clearing Timber [01] (Engineer recruitment program)", Columbia River Basin Project: Dam Construction in the Pacific Northwest, University of Idaho Library Digital Collections, https://www.lib.uidaho.edu/digital/crbp/items/crbp1231.html
Rights
- Rights:
- In copyright, educational use permitted. Educational use includes non-commercial reproduction of text and images in materials for teaching and research purposes. For other contexts beyond fair use, including digital reproduction, please contact the University of Idaho Library Special Collections and Archives Department at [libspec@uidaho.edu](mailto:libspec@uidaho.edu). The University of Idaho Library is not liable for any violations of the law by users.
- Standardized Rights:
- http://rightsstatements.org/vocab/InC-EDU/1.0/