IMAGE

Making Use Of Temporary Channel (Engineer recruitment program) Item Info

Title:
Making Use Of Temporary Channel (Engineer recruitment program)
Creator:
United States. Army. Corps of Engineers.
Date Created:
1960
Description:
With diversion of the Columbia River through the North Shore spillway bays at the U.S Army Corps of Engineers' John Day Lock and Dam, barges and tows are now utilizing the temporary channel and permanent lock of the huge multipurpose project.
Subjects:
dams in U.S. West engineer recruitment program
Location:
Washington (State) Klickitat County Rufus
Latitude:
45.716652
Longitude:
-120.703225
Publisher:
University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/
Source:
Army Corps of Engineers Dam Construction photographs, 1933-1965, PG 94, University of Idaho Library Special Collections and Archives
Finding Aid:
https://archiveswest.orbiscascade.org/ark:80444/xv165618
Source Identifier:
94-0-21
Type:
Image;StillImage
Format:
image/jpeg

Contact us about this record

Source
Preferred Citation:
"Making Use Of Temporary Channel (Engineer recruitment program)", Columbia River Basin Project: Dam Construction in the Pacific Northwest, University of Idaho Library Digital Collections, https://www.lib.uidaho.edu/digital/crbp/items/crbp1209.html
Rights
Rights:
In copyright, educational use permitted. Educational use includes non-commercial reproduction of text and images in materials for teaching and research purposes. For other contexts beyond fair use, including digital reproduction, please contact the University of Idaho Library Special Collections and Archives Department at [libspec@uidaho.edu](mailto:libspec@uidaho.edu). The University of Idaho Library is not liable for any violations of the law by users.
Standardized Rights:
http://rightsstatements.org/vocab/InC-EDU/1.0/