IMAGE
Construction Of John Day Lock And Dam Powerhouse [01] (Engineer recruitment program) Item Info
- Title:
- Construction Of John Day Lock And Dam Powerhouse [01] (Engineer recruitment program)
- Creator:
- United States. Army. Corps of Engineers.
- Date Created:
- 1965
- Description:
- The U.S Army Corps of Engineers' John Day Lock and Dam South Shore Powerhouse section is well past the 40% completion mark under the $73, 356,000 contract held by Vinnell-McNamara-Mannix-Fuller. This picture was taken from the deck of the mid river spillway section of the dam, looking down into the 25-acre South Shore work area.
- Subjects:
- dams in U.S. West engineer recruitment program
- Location:
- Washington (State) Klickitat County Rufus
- Latitude:
- 45.710898
- Longitude:
- -120.688462
- Publisher:
- University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/
- Source:
- Army Corps of Engineers Dam Construction photographs, 1933-1965, PG 94, University of Idaho Library Special Collections and Archives
- Finding Aid:
- https://archiveswest.orbiscascade.org/ark:80444/xv165618
- Source Identifier:
- 94-0-20
- Type:
- Image;StillImage
- Format:
- image/jpeg
Source
- Preferred Citation:
- "Construction Of John Day Lock And Dam Powerhouse [01] (Engineer recruitment program)", Columbia River Basin Project: Dam Construction in the Pacific Northwest, University of Idaho Library Digital Collections, https://www.lib.uidaho.edu/digital/crbp/items/crbp1208.html
Rights
- Rights:
- In copyright, educational use permitted. Educational use includes non-commercial reproduction of text and images in materials for teaching and research purposes. For other contexts beyond fair use, including digital reproduction, please contact the University of Idaho Library Special Collections and Archives Department at [libspec@uidaho.edu](mailto:libspec@uidaho.edu). The University of Idaho Library is not liable for any violations of the law by users.
- Standardized Rights:
- http://rightsstatements.org/vocab/InC-EDU/1.0/