IMAGE

Cleaning East Powerhouse Area (Spillway and drum gate construction) Item Info

Title:
Cleaning East Powerhouse Area (Spillway and drum gate construction)
Creator:
Pomeroy, F.B.
Date Created:
1941-12-29
Description:
Men and machines clean up debris from powerhouse area. Dam is in the background.
Subjects:
dam construction spillway and drum gate construction
Location:
Washington (State) Grant County Grand Coulee Dam
Latitude:
47.960973
Longitude:
-118.972932
Publisher:
University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/
Source:
Army Corps of Engineers Dam Construction photographs, 1933-1965, PG 94, University of Idaho Library Special Collections and Archives
Finding Aid:
https://archiveswest.orbiscascade.org/ark:80444/xv165618
Source Identifier:
94-3-9630
Type:
Image;StillImage
Format:
image/jpeg

Contact us about this record

Source
Preferred Citation:
"Cleaning East Powerhouse Area (Spillway and drum gate construction)", Columbia River Basin Project: Dam Construction in the Pacific Northwest, University of Idaho Library Digital Collections, https://www.lib.uidaho.edu/digital/crbp/items/crbp1141.html
Rights
Rights:
In copyright, educational use permitted. Educational use includes non-commercial reproduction of text and images in materials for teaching and research purposes. For other contexts beyond fair use, including digital reproduction, please contact the University of Idaho Library Special Collections and Archives Department at [libspec@uidaho.edu](mailto:libspec@uidaho.edu). The University of Idaho Library is not liable for any violations of the law by users.
Standardized Rights:
http://rightsstatements.org/vocab/InC-EDU/1.0/