IMAGE
Station Service From Balcony (Powerhouse construction) Item Info
- Title:
- Station Service From Balcony (Powerhouse construction)
- Creator:
- Pomeroy, F.B.
- Date Created:
- 1940-08-01
- Description:
- The two 14,000 h.p. station-service turbines at the left powerhouse are embedded in concrete to elevation 951, the generator floor level.
- Subjects:
- power plants in Washington state (Grand Coulee Dam) powerhouse construction
- Location:
- Washington (State) Grant County Grand Coulee Dam
- Latitude:
- 47.959622
- Longitude:
- -118.97622
- Publisher:
- University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/
- Source:
- Army Corps of Engineers Dam Construction photographs, 1933-1965, PG 94, University of Idaho Library Special Collections and Archives
- Finding Aid:
- https://archiveswest.orbiscascade.org/ark:80444/xv165618
- Source Identifier:
- 94-3-6705
- Type:
- Image;StillImage
- Format:
- image/jpeg
Source
- Preferred Citation:
- "Station Service From Balcony (Powerhouse construction)", Columbia River Basin Project: Dam Construction in the Pacific Northwest, University of Idaho Library Digital Collections, https://www.lib.uidaho.edu/digital/crbp/items/crbp1139.html
Rights
- Rights:
- In copyright, educational use permitted. Educational use includes non-commercial reproduction of text and images in materials for teaching and research purposes. For other contexts beyond fair use, including digital reproduction, please contact the University of Idaho Library Special Collections and Archives Department at [libspec@uidaho.edu](mailto:libspec@uidaho.edu). The University of Idaho Library is not liable for any violations of the law by users.
- Standardized Rights:
- http://rightsstatements.org/vocab/InC-EDU/1.0/