PDF

Geohydrologic conditions in the vicinity of Bunker Hill Company waste-disposal facilities Item Info

Title:
Geohydrologic conditions in the vicinity of Bunker Hill Company waste-disposal facilities
Authors:
Rouse, Jim V.
Date Created (ISO Standard):
1977-03
Description:
The Bunker Hill Central Impoundment Area, gypsum pond, and slag pile receives solid and liquid waste from the Bunker Hill mine, mill, and smelter complex. The waste disposal system was not designed as such and does not represent the state of the art. Rather, the system gradually evolved over aperiod of years with no overall plan and no safety or geohydrologic analysis.
Subjects:
mine wastes heavy metals water pollution prevention
Location:
Coeur d'Alene Basin
Latitude:
47.52
Longitude:
-116.56
Collection:
Coeur d'Alene Basin
Rights:
Rights to the digital resource are held by the University of Idaho. http://www.uidaho.edu/
Publisher:
University of Idaho
Contributing Institution:
University of Idaho
Type:
Text
Format:
application/pdf
Cataloger:
wbv
Date Digitized:
2012

Contact us about this record

Source
Preferred Citation:
"Geohydrologic conditions in the vicinity of Bunker Hill Company waste-disposal facilities", Idaho Waters Digital Library, University of Idaho Library Digital Collections, https://www.lib.uidaho.edu/digital/iwdl/items/iwdl-cda_rouse_1977.html
Rights
Rights:
Rights to the digital resource are held by the University of Idaho. http://www.uidaho.edu/