PDF
Geohydrologic conditions in the vicinity of Bunker Hill Company waste-disposal facilities Item Info
- Title:
- Geohydrologic conditions in the vicinity of Bunker Hill Company waste-disposal facilities
- Authors:
- Rouse, Jim V.
- Date Created (ISO Standard):
- 1977-03
- Description:
- The Bunker Hill Central Impoundment Area, gypsum pond, and slag pile receives solid and liquid waste from the Bunker Hill mine, mill, and smelter complex. The waste disposal system was not designed as such and does not represent the state of the art. Rather, the system gradually evolved over aperiod of years with no overall plan and no safety or geohydrologic analysis.
- Subjects:
- mine wastes heavy metals water pollution prevention
- Location:
- Coeur d'Alene Basin
- Latitude:
- 47.52
- Longitude:
- -116.56
- Collection:
- Coeur d'Alene Basin
- Rights:
- Rights to the digital resource are held by the University of Idaho. http://www.uidaho.edu/
- Publisher:
- University of Idaho
- Contributing Institution:
- University of Idaho
- Type:
- Text
- Format:
- application/pdf
- Cataloger:
- wbv
- Date Digitized:
- 2012
Source
- Preferred Citation:
- "Geohydrologic conditions in the vicinity of Bunker Hill Company waste-disposal facilities", Idaho Waters Digital Library, University of Idaho Library Digital Collections, https://www.lib.uidaho.edu/digital/iwdl/items/iwdl-cda_rouse_1977.html
Rights
- Rights:
- Rights to the digital resource are held by the University of Idaho. http://www.uidaho.edu/